The Process
Loading On Conveyor

Our 780 foot conveyor line is where we begin the powder coating process.
During this process, parts are visually checked for damage and rust. Any findings are then reported to the appropiate supervisors.


Pretreatment (All Metals)

Pretreatment is a vital step in the preparation of metal prior to powder coating. Our high pressure washes include:
  • One stage of multi-purpose iron phosphate at 120ºF -180ºF for 3 minutes.
  • Two stages of dionized water for 1-1/2 minutes each stage.
  • 1 Stage of fresh dionized misting rinse.
  • This ensures a thoroughly clean and phosphate coated surface that provides excellent corrosion resistance and powder paint adhesion on all types of metal products. Our multi-pupose iron phosphate applies the following coating weights:

  • Steel - 50 - 60 mg / ft2
  • Aluminum - 5 -15 mg / ft2
  • Galvanized - 15 - 50 mg / ft2

Dry Off and Powder Application

Copyright © 1999
All Rights Reserved
Our Powder Coating
E-Mail:
info@ourpowdercoating.com
Phone: (562) 946-0525

The Plant
The Process
Get a Quote
Colors
Home